Golf Residence

Golf Residence compound is in 6th of October city, which is built over 22 acres area that holds 600 residential units where each building consists of a ground floor and three floors and a roof. Project construction started in 2010 and phase on is constructed and now the last phase is under construction.
  • IMG_0396
  • IMG_1487-1
  • IMG_1462
  • IMG_1440
  • IMG_1406-1
  • IMG_1369
  • IMG_1356-1
  • IMG_1264-1
  • GolfResidence7
  • GolfResidence6
  • GolfResidence5
  • GolfResidence4
  • GolfResidence3
  • GolfResidence2
  • GolfResidence1

Golf Residence Compound

Compound location:

Golf Residence Compound in 6th of October city, Located 10 minutes from the Remaya Square and about 4 kilometers from the entrance of AL Wahat road, 15 minutes of Johaina square near the global village and the city of Zewail and Zamalek Sports club and EL Trsanah Sports Club.

Compound Description:

– Golf Residence compound is built on 22 acres area and includes 465 residential units.
– On 22 acres of buildings on the proportion of 20% of the total are representing green spaces (80%) of the total area of the compound and buildings (20%), street width (24 m) and have been sold (93%) of the units and delivered (78%) of the units and are communicating with clients outside of Egypt to delivered the remaining units of the project.
– The Compound full facilities (electricity, sanitation and water)
– Golf Residence compound includes two artificial lakes and mini golf course.
– Integrated services area on the space available (5) acres to serve the compound.
The Compound composed of:
• Shopping mall
• Medical Center
• Nursery
• Mosque to accommodate about 800 worshipers
• Gym

Building specifications:

– Number of buildings (31) Residential Buildings to provide about 465 residential units.
– Units space start from 135 m2 to 270 m2.
– The building is composed of ground floor and three floors plus roof available for each building:
• Elevator
• The Intercom
• Central satellite dish.

The facades of buildings paints fully modern and ramps and walls of marble granite stairs marble floors delivered units semi-finishing and destination Alimental.

– The beginning of Construction [Golf Residence] March 2010, and the project was fully delivered in December 2015.

Project management:

Managed by owners association to choose a professional company to manage the project to provide the following services:
• Security
• Surveillance cameras for public areas (24/7)
• Professional security personnel dressed uniformly
• Cleanliness Service
• Maintenance-round (24/7) for all areas for the compound buildings and public buildings.

Golf Residence